UPS Runtime Calculator: Estimate Backup Time by Load
Tell us your equipment load and required runtime. We'll show every UPS in our catalogue that fits, with the estimated runtime at your specific load.
UPS Solutions Builder
Not sure which UPS you need?
Enter your load, the runtime you need and your outlet. The UPS Solutions Builder suggests UPS systems, battery packs and accessories with their prices, and flags what needs a technical check.
Find a UPS that fits your load
Drag the slider to your equipment's wattage. Pick a minimum runtime. We'll rank the UPS units in our catalogue by how well they match.
Power factor 0.80 VA × power factor = real load in watts. Default 0.8 covers most modern IT gear.
Advanced settings
Recommended UPS units
Sorted by best fit. UPS units sized to run at 60-80% of capacity get top placement.
No UPS in our catalogue meets that load and runtime requirement. Try a smaller load, a shorter runtime, or contact a specialist for an engineering assessment.
Complete your setup
Accessories that pair with the recommended UPS. Model-specific accessories are listed on each product page.
UPS Runtime Calculator: enter your UPS capacity (VA or kVA) and connected load (watts) to estimate expected backup time during a power outage. Useful for sizing replacement batteries, planning generator-bridge time, and validating manufacturer-specified runtimes against real-world load.
How long will your UPS run, and how do you read the maker's chart? (4-minute video)
Chapters and transcript
- 0:00 Why Is UPS Runtime Read in Watts Instead of VA?
- 0:54 How Do You Read APC, CyberPower, and Eaton Runtime Charts?
- 2:11 What Shortens Runtime, and When Do Extended Battery Packs Apply?
- 3:55 How Do You Use the UPS Runtime Calculator to Size Your Backup?
UPS runtime is measured in minutes on battery and is read from your load in watts, not VA. In APC White Paper 15, watts measure real power drawn, while VA measures apparent power from voltage times current. Their ratio is the power factor: 0.99 to 1.0 on PFC supplies and 0.55 to 0.75 on capacitor-input supplies. Neither the watt nor the VA rating may be exceeded, and small computer units often rate watts near 60% of VA. CyberPower rates CP1500PFCLCD at 1500 VA and 1000 watts, and OR1500PFCLCD at 1500 VA and 1050 watts. APC rates SMX1500RM2UC at 1440 VA and 1350 watts, while Eaton rates 5PX1500RT at 1440 VA and 1440 watts.
Maker runtime charts plot minutes against watts, and on each chart shown here, halving load more than doubles minutes. On APC's SMX1500RM2UC data sheet, the 48-volt APCRBC115 cartridge runs 5 minutes at 1350 watts and 15 minutes at half load. CyberPower's CP1500PFCLCD uses two 12-volt, 9 amp-hour batteries in RB1290X2 for 2.5 minutes at 1000 watts and 10 minutes at half load. CyberPower's OR1500PFCLCD with RB1290X2B runs 4 minutes at 1050 watts and 12.5 minutes at half load, with an 8-hour typical recharge. CyberPower's PR1500LCDRTXL2U with RB1290X4F runs 5 minutes at 1500 watts full load and 14 minutes at half load. On Eaton's 5PX1500RT graph, 12-volt, 7.2 amp-hour batteries run 3 minutes at 1440 watts, 10 at 720, 30 at 288, and 77 at 144 watts. At 208 volts, Eaton's 3U 9PX3K3UG2 with EBP-1805 runs 7.5 minutes at 3000 watts and 18.5 minutes at half load.
Weak or aging batteries reduce runtime, while external battery modules multiply backup minutes on extendable UPS units. APC graphs test new, fully charged batteries at PF 1.0, and CyberPower tests new, fully charged batteries under normal conditions. In the APC Smart-UPS SMT and CyberPower CP1500PFCLCDa manuals, runtime drops when a battery is worn out or recharging. Eaton's 9SX user manual notes that battery runtime is reduced below 10 °C. Battery life is measured in years: APC's SMX1500RM2UC lists 3 to 5 years, and CyberPower's CP1500PFCLCDa lists 3 to 6 years. Eaton's 9SX user manual states that a 3-5 year battery life requires 25 °C, or 77 °F. In that Eaton 9SX manual, battery life is divided by 2 for each 10 °C above 25 °C, with 4-year replacement. APC's SMX1500RM2UC adds the 2U 48-volt, 864 volt-amp-hour SMX48RMBP2U pack, and CyberPower's PR1500LCDRTXL2U adds BP48V75ART2U. On Eaton's 5PX1500RT with 5PXEBM48RT modules, 720-watt runtime rises from 10 to 74 minutes with 1 module and 227 minutes with 4. On Eaton's 9PX3K3UG2 with 9PXEBM180RTG2 modules, 1500-watt runtime climbs from 18.5 to 71 minutes with 1 module and 247 minutes with 4.
Type your watt load and target minutes into the runtime calculator, then confirm your model against the maker chart. Choose watts, kilowatts, VA, or kVA with the 0.80 power factor slider, or pick a 500 to 6000 watt preset. Checked against the three makers' charts at half and full load, the calculator lands within 7 percent across every tested model.
How to Use the Calculator
- Find your UPS capacity: printed on the UPS nameplate, typically in VA (e.g. 1500VA) or kVA (e.g. 10kVA). Convert if needed: 1 kVA = 1000 VA.
- Estimate your connected load in watts: add up the wattage of every device plugged into the battery-backup outlets. Servers, monitors, switches, NAS, etc. Most equipment lists draw on the back-panel sticker.
- Enter both values above and the calculator returns expected runtime at that load. As a rule of thumb: full load = 5 to 15 minutes; half load = 15 to 40 minutes; quarter load = 1+ hour on standard internal batteries.
Sizing Tips
- Add 25% headroom to your real load when sizing a new UPS: this leaves room for equipment changes and prevents overload trip.
- Match VA to wattage carefully: a 1500VA UPS typically delivers only ~900W continuous (power factor ~0.6 to 0.7 for older units, ~1.0 for modern Smart-UPS / Eaton 9PX). Wattage is what matters for sizing real loads.
- For longer runtimes, add an external battery cabinet (most online UPS units support this) rather than oversizing the UPS frame itself.
- For loads that will grow, consider a modular UPS platform, capacity and N+1 redundancy scale by adding power modules instead of replacing the unit.
- For mission-critical loads, size to bridge generator startup (typically 8 to 12 seconds) plus a defensive buffer, the UPS is the bridge, not the long-duration backup.
- Battery age matters: by year 4 a VRLA battery typically delivers ~70% of nameplate capacity. Schedule replacement at year 3.5 to 4 in 24/7 deployments, see our UPS battery replacement service.
Related Resources
- UPS Battery Cross-Reference & Finder: replacing a battery instead of the UPS? Find the exact fit by model or RBC number
- Modular UPS Systems Guide: scalable frames, hot-swap modules, and the N+1 math
- UPS FAQ: single-phase vs three-phase, medical-grade, sizing
- UPS Battery FAQ: lifespan, replacement, compatibility
- Battery Technical FAQ: SLA / VRLA basics, V/Ah matching
- All UPS Replacement Batteries: our own compatible cartridges for APC RBC, Eaton 744-series, Vertiv GXT and Tripp Lite RBC units
- Line-Interactive vs Online UPS: topology decision guide
- Single-Phase Smart UPS Comparison: APC vs Eaton vs Vertiv selection
Need Help Sizing Your UPS?
If your environment is mission-critical: healthcare, data centre, mining, government IT, a calculator is a starting point but a proper site survey beats it. Our team handles full UPS installation and consulting with site assessment, load analysis, and code-compliant deployment across Canada. Contact us for a consultation: or call 438-881-3363.
Need more backup time than the numbers show? See our UPS extended battery modules.
Choosing the UPS itself? See how to choose a UPS for a network closet.
Talk to a Canadian UPS specialist
Send us your equipment list and we'll spec the right UPS, including extended battery pack options if you need longer runtime than a single UPS can deliver.