Xtreme Power E91-30K4 30000 VA / 30000 W Three-Phase Online UPS, 208/120 V, Extended Runtime
- Power
- 30000 VA / 30000 W
- Form
- Tower
- Outlets
- 1× Hardwire terminal block
We confirm price and freight before ordering.
Find UPS systems, replacement batteries and accessories for your equipment.
Not sure which one fits? Open the UPS Solutions Builder →
We confirm price and freight before ordering.
We confirm price and freight before ordering.
We confirm price and freight before ordering.
We confirm price and freight before ordering.
We confirm price and freight before ordering.
We confirm price and freight before ordering.
We confirm price and freight before ordering.
We confirm price and freight before ordering.
We confirm price and freight before ordering.
We confirm price and freight before ordering.
We confirm price and freight before ordering.
We confirm price and freight before ordering.
We confirm price and freight before ordering.
We confirm price and freight before ordering.
We confirm price and freight before ordering.
We confirm price and freight before ordering.
We confirm price and freight before ordering.
We confirm price and freight before ordering.
We confirm price and freight before ordering.
We confirm price and freight before ordering.
We confirm price and freight before ordering.
We confirm price and freight before ordering.
We confirm price and freight before ordering.
We confirm price and freight before ordering.
Three-phase UPS systems for data centres, industrial plants and critical facilities, from 5 kVA rack units to multi-hundred-kW modular frames, with battery cabinets, bypass panels and turnkey installation. Start from a family hub: Eaton 9355, Eaton 93PM, Eaton 93E, APC Galaxy VS, MGE Galaxy 3500, APC Symmetra PX, Vertiv Liebert APS, Vertiv Liebert ITA2, or see the modular UPS guide for scalable platforms including XPC M90/X90. Every system is quoted as a complete turnkey project: equipment, batteries, freight, licensed installation and commissioning. We do the hard work.
A three-phase UPS feeds racks, rooms and small data centres where the load has outgrown single-phase power. Three-phase input (208/120 V or 480 V depending on the model) spreads the load across three conductors, which keeps current, cable size and heat manageable as capacity grows. The three-phase units here are online double-conversion: the load always runs on regenerated power, and a utility failure transfers with zero break.
The collection covers the families we supply and support in Canada, XPC first: Xtreme Power Conversion E91 three-phase systems, then Eaton 9355 and 93PM (Eaton has discontinued the 93E and the BladeUPS), APC Galaxy VS, Easy UPS 3S and Symmetra, and Vertiv Liebert ITA2, from 8 kVA rack systems to 80 kVA floor-standing units. Most models above CAD 10,000 are sold by quote so the voltage, wiring and battery configuration match your room.
A representative selection. The full list with every capacity and voltage is in the product grid below.
| Model | Family | Capacity | Form factor | Input | Full-load runtime |
|---|---|---|---|---|---|
| E91-10K | Xtreme Power E91 | 10 kVA / 10 kW | Tower | Hardwired | 11 min |
| E91-20K | Xtreme Power E91 | 20 kVA / 20 kW | Tower | Hardwired | 7 min |
| E91-30K4 | Xtreme Power E91 | 30 kVA / 30 kW | Tower | Hardwired | 9 min |
| E91-40KL | Xtreme Power E91 | 40 kVA / 40 kW | Tower | Hardwired | on request |
| GVSUPS20K100B3H | APC Galaxy VS | 20 kVA / 20 kW | Floor-standing | Hardwired | on request |
| 9EG04GG03001003 | Eaton 93E (discontinued) | 40 kVA / 32 kW | Floor-standing | on request | 7 min |
| 9PG06P0009E20R2 | Eaton 93PM | 60 kW modular | Floor-standing | on request | on request |
| ZP2261000000000 | Eaton BladeUPS (discontinued) | 60 kW, N+1 | Floor-standing | Hardwired | 6 min |
| ITA2-15KRT208V11UN | Vertiv Liebert ITA2 | 15 kVA / 15 kW | Rackmount 5U+ | Hardwired | on request |
| ITA2-10KRT208C | Vertiv Liebert ITA2 | 10 kVA / 10 kW | Tower/rack | Hardwired | 8 min |
| ITA2LI-08KRT2085UN | Vertiv Liebert ITA2 Lithium-Ion | 8 kVA / 7.2 kW | Rackmount 5U+ | Hardwired | 14 min |
Runtimes are manufacturer full-load figures with the internal batteries shown. Most three-phase systems extend runtime with battery cabinets, so the runtime you get depends on the configuration.
Start with your voltage. Most rooms in Canada run 208/120 V three-phase, which the ITA2, Galaxy VS and 9355 families serve directly. 480 V inputs exist on specific models; if your building distribution is 480 V you need a model rated for it or a step-down transformer in front of it. Get this right before anything else.
Size in kW, not just kVA. Servers draw close to unity power factor, so the watt rating is the real limit. A 40 kVA / 32 kW 93E carries 32 kW, full stop. Add 20 to 25 percent headroom for growth.
Decide how much runtime. Internal batteries give minutes, enough to ride through a transfer or shut down hosts. If you must bridge to a generator, add external battery cabinets sized to your load; ask us for a runtime calculation with your load in watts.
Rack or floor. ITA2 and the 8 kW BladeUPS fit the rack. Galaxy VS, 93E and 93PM are floor-standing cabinets that need aisle space, and the larger units need a floor that carries their weight.
Plan the wiring and service. Three-phase UPS systems are hardwired by a licensed electrician, and a maintenance bypass cabinet lets you service the UPS without dropping the load. Budget for both.
Three-phase projects rarely end at one box. Request a quote with your load in watts, input voltage and phase, runtime target and whether you need an external bypass or battery cabinets, and we will confirm the model and configuration. Larger systems are quoted with the battery and bypass options included. Ships from Canada.
Related guides: lithium-ion UPS systems and external battery cabinets.
208/120 V or 480 V input?
Match the UPS to your building distribution. Most IT rooms run 208/120 V. 480 V is common at the service entrance and in industrial plants; ask us which listed models take it directly.
Do I need an electrician?
Usually, yes. Most three-phase UPS here are hardwired; check the Input column of the table for the exceptions. Your electrician pulls the feeders and lands them on the UPS input terminals.
What is N+1 on a three-phase UPS?
On modular systems like BladeUPS and 93PM, one power module more than the load needs. If any single module fails or comes out for service, the rest carry the load.
Can these run single-phase loads?
Yes. A 208/120 V three-phase unit supplies 120 V receptacles or panels, which is the usual way racks of single-phase gear sit behind one three-phase UPS.
Do you help size the system?
Yes. Send the load list in watts, the voltage and the runtime you need, and we return a configuration with the battery count.