About this UPS
APC / Schneider Electric Symmetra PX three-phase UPS — series hub. The Symmetra PX is APC's classic modular three-phase platform: N+1-capable power modules, battery modules and intelligence modules in one frame, scalable while running. Its installed base in data centres is enormous — which is why we stock frames from 10 to 250 kW alongside refurbished power modules and battery spares that keep existing systems alive. Turnkey supply: equipment, freight, licensed installation, batteries and commissioning in one quote — request yours, call 438-881-3363, or compare families in the three-phase UPS guide.
APC Symmetra PX family — stocked models
Range: 10–250 kW (frames to 500 kW) · modular frame (tower/rack) · 208 V and 400/480 V classes. Double-conversion online, three-phase.
| Model | Link |
|---|---|
| Symmetra PX 10 kW — 40 kW frame | View / quote → |
| Symmetra PX 20 kW — 40 kW frame | View / quote → |
| Symmetra PX 30 kW — 40 kW frame | View / quote → |
| Symmetra PX 40 kW — 40 kW frame (this page) | View / quote → |
| Symmetra PX 30 kW — 100 kW frame | View / quote → |
| Symmetra PX 50 kW — 100 kW frame | View / quote → |
| Symmetra PX 80 kW — 100 kW frame | View / quote → |
| Symmetra PX 32 kVA — 96 kVA frame, 400 V | View / quote → |
| Symmetra PX 150 kVA — 250 kVA frame | View / quote → |
| SYPM10KF 10 kW power module — refurbished, tested | View / quote → |
Buy the frame for the end-state, populate modules for today's load plus one for N+1 — then grow in 10 kW steps. Keeping an existing PX alive? The refurbished SYPM10KF module and Symmetra battery units are the economical path. Send the requirement →
Where the Symmetra PX fits
How the Symmetra PX compares
The modular institution: unmatched installed base and a living spares market (including refurbished modules) — chosen new for in-place growth, kept alive for decades by module and battery refreshes. Undecided between families? Start from the three-phase UPS family guide.
Runtime & expansion — batteries, cabinets, bypass
Runtime and redundancy both live in the frame: battery modules stack for hold time, power modules for capacity and N+1. We also stock the refurbished-module path for existing installs.
- Symmetra PX battery units (SYBT4 and family) — stocked battery collection
- SYPM10KF 10 kW power module — refurbished — capacity or N+1 for existing frames
- Extended-run battery frames — quoted per runtime target (quote it)
Turnkey: from quote to running system
- Tell us the requirement — model or just load, runtime and site details.
- One configured quote — UPS, batteries/cabinets, bypass, freight, installation and commissioning together.
- We do the hard work — logistics, rigging, licensed electricians, startup, and preventive maintenance afterward. Replacing equipment? We buy back working units.
Common questions
Can I still get parts and batteries for a Symmetra PX?
Yes — battery units, power modules (including tested refurbished SYPM10KF) and intelligence modules remain available, and we support existing frames with supply and installation. Retiring a frame? We also buy back working modules.
How does N+1 work on the PX?
Populate one power module beyond the load requirement: any single module can fail or be hot-swapped while the remaining modules carry the load — no shutdown, no transfer to bypass.
New frame or keep the existing one alive?
If the frame and wiring are sound, refreshing batteries and modules is a fraction of replacement cost. When the load has outgrown the frame, we quote the modern equivalent with trade-in on your old modules.
Do you deliver a working system or boxes?
A working system — freight, rigging, licensed electrical work, module population, battery configuration and commissioning in one turnkey quote. We do the hard work.
How do pricing and lead time work on three-phase systems?
Three-phase systems are quoted, not carted: pricing depends on configuration, batteries, freight class and installation scope. Send the requirement and you get a firm, itemized quote — and honest availability for each option before you commit.
Do you supply and install outside major cities?
Yes — supply, freight and installation are coordinated wherever the site is, through our network of licensed electricians and riggers. Remote and industrial sites are quoted with site logistics included.
All product and company names are trademarks of their respective holders. UPS Plus Battery is an independent supplier and is not affiliated with, endorsed by, or sponsored by the manufacturers listed.
Related
- Three-phase UPS family guide — compare every stocked range
- Modular UPS systems guide — frames, modules and the N+1 math
- All three-phase UPS systems in stock
- UPS sizing & runtime calculator
- Refurbished UPS — when it makes sense
Model, batteries, bypass, freight, installation — one number, one accountable team.
Request a quote →or call 438-881-3363Technical specifications
How long it'll keep your equipment up.
Manufacturer-specified runtime at typical loads. Real-world figures depend on battery age, ambient temperature, and load profile.
Need more runtime? This UPS accepts external battery packs (XBPs). Contact us about XBP options →
Estimate based on manufacturer-specified runtime curve. Real-world runtime varies with battery age, ambient temperature, and load profile.
Replacement batteries that fit this exact UPS
A line-interactive UPS typically needs new batteries every 3–5 years. We stock the matching replacement cartridges — Canadian warranty.
Before you order
How do I know this UPS will run my equipment?
Add up the wattage draw of every device you'll plug in (servers, switches, monitors). The UPS's wattage rating — not VA — is the number that matters. Aim for the UPS to run at 60–70% of capacity at full load: this gives headroom for inrush current and a meaningful runtime margin. Email us your equipment list and we'll size the right UPS within one business hour.
What's covered by the warranty, and how long does it last?
New units carry the full manufacturer warranty registered to you on receipt. The manufacturer handles claims directly via their North American support channel. Refurbished units are covered by our own 1-year UPSPLUSBATTERY warranty handled in-house in Canada.
Can I extend runtime beyond what's shown above?
Many Smart-UPS-class models accept an external battery pack (XBP) connected to the rear battery port. If this UPS shows "Extended Runtime Capable: Yes" in the spec grid above, an XBP is supported. Compatible XBPs and the runtime gain they deliver vary by model — contact us if you don't see the right XBP in our catalogue.



