Tripp Lite SU700XLCD 700VA / 630W Online Double-Conversion UPS
- VA
- 700
- Watts
- 630
- Form
- Tower
- Topology
- Online Double-Conversion
- Outlets
- 6× NEMA 5-15R
Tripp Lite (Eaton) SmartOnline double-conversion online UPS — SU-series 750 VA to 20 kVA single-phase, plus SmartOnline S3M three-phase 10 to 80 kVA. Zero transfer, fully regenerated output, PowerAlert software, SNMP card slot.
Online (double-conversion) UPS runs the load permanently from the inverter — utility AC continuously rectified to DC, then re-inverted to clean AC before reaching equipment. Transfer time effectively zero milliseconds during a power event, complete galvanic isolation from utility-side disturbances, fully regenerated sine wave at all times. Required topology for medical equipment, VoIP PBX, precision laboratory gear, industrial control, and edge data centres where line-interactive transfer is unacceptable.
Tripp Lite (now part of Eaton) builds two online lines: SmartOnline SU-series 750 VA to 20 kVA single-phase, and SmartOnline S3M three-phase 10–80 kVA for data centre and large facility. UPSPLUSBATTERY.CA stocks the SU-series with matching Tripp Lite replacement batteries. For line-interactive equivalents see Tripp Lite line-interactive UPS. Full Tripp Lite catalog at Tripp Lite UPS.
| Line | Model prefix | VA / kVA range | Phase | Notable features |
|---|---|---|---|---|
| SmartOnline SU | SU, SUINT | 750 VA – 20 kVA | Single-phase 120 V or 208/230 V | 0.9–1.0 PF, PowerAlert, SNMP card slot |
| SmartOnline S3M | S3M, S3MX | 10 – 80 kVA | Three-phase 208 V | Modular, hot-swap power and battery, data-centre |
Most mid-enterprise IT decisions on the Tripp Lite side land in the SU-series 1.5–6 kVA range. S3M three-phase covers data-centre rows and larger facility deployments.
When load can't tolerate the 2–4 ms transfer of line-interactive — medical diagnostic, VoIP PBX, precision lab, industrial control, active-PFC supplies. When utility waveform is unusually dirty. When galvanic isolation is required. Line-interactive vs online UPS.
SU-series at 1.5 kVA – 3 kVA: typically 0.9 PF (SU3000RTXL2U delivers ~2700 W at 3000 VA). SU 6 kVA+: approach unity PF. Add nameplate watts of all loads, multiply by 1.25 buffer, pick the UPS whose watt rating exceeds. UPS sizing guide.
Up to 10 kVA single-phase covers most rack-level deployments. Above that or where upstream service is three-phase, SmartOnline S3M is the right tier — modular hot-swap power and battery blocks for capacity expansion and N+1 redundancy.
| Model | Power | PF | Chassis | Replacement battery |
|---|---|---|---|---|
| SU750RT2U | 750 VA / 680 W | 0.9 | 2U rack/tower | RBC93-2U |
| SU1500RT2U | 1500 VA / 1350 W | 0.9 | 2U rack/tower | RBC93-2U |
| SU3000RTXL2U | 3000 VA / 2700 W | 0.9 | 2U rack/tower | RBC94-2U |
| SU6000RT4U | 6000 VA / 4200 W | 0.7 | 4U rack/tower | RBC96-2U |
| SU10KRT3UTAA | 10 kVA / 9 kW | 0.9 | 3U rack (modular) | SUBM10KRM3U or matching pack |
All SU-series ship with PowerAlert software for shutdown integration and an SNMP card slot for network monitoring.
Tripp Lite uses RBC and BP series part numbers — RBC93-2U for SU750/SU1500, RBC94-2U for SU3000RTXL2U, RBC94-3U for SU3000RT3U, RBC96-2U for SU6000RT4U. We stock compatible aftermarket cartridges built to identical V, Ah, terminal, and connector spec as factory cells. 1-year UPSPLUSBATTERY warranty. See Tripp Lite replacement batteries and Tripp Lite RBC guide.
SU 750 / 1500 / 3000 VA plug-and-play (NEMA 5-15P or L5-30P depending on model). SU 6 kVA+: typically L6-30P or hard-wired by licensed electrician per CSA. S3M three-phase always hard-wired with site commissioning. Warranty: typically 2–3 years electronics on SmartOnline. Coordinated through our Canadian team. Shipped from our Canadian warehouse — see shipping policy for rates and timing. Replies within 1 business day.
SmartPro is line-interactive (2–4 ms transfer, AVR). SmartOnline is double-conversion online (zero transfer, fully regenerated). SmartOnline is required for medical, VoIP PBX, precision instrumentation.
Effectively zero. Load runs continuously from inverter — no switching event when utility fails.
SU-series supports BP-series external battery packs on most rack/tower SKUs. Confirm by model.
SNMP card slot standard on SU-series. PowerAlert software ships standard for shutdown integration with Windows, Linux, VMware.
When upstream is three-phase, when load exceeds ~10 kVA single-phase, or when modular hot-swap redundancy is required. Always commissioned by qualified Tripp Lite / Eaton-authorised technician.
3–5 years SLA in 20–25 °C climate-controlled. Above 25 °C, life halves roughly every 8 °C. When to replace UPS battery.
Yes — Tripp Lite (Eaton) factory warranty terms cover Canada. Coordinated through our Canadian team. RMA does not require cross-border shipping. Shipped from our Canadian warehouse.
Our Canadian team has specified APC, Eaton, Tripp Lite, Vertiv, Mitsubishi, Toshiba, CyberPower, XPC, and Delta UPS for healthcare, data centres, and government. Enquiries answered in business hours.