Tripp Lite SmartOnline SU80K 80kVA Tower UPS - SU80K - Double Conversion Online UPS, 120 V AC,208 V AC, Tower, 120 V AC,208 V AC, Hard Wire 4-wire, SmartOnline, 80 kVA
- VA
- 80000
- Watts
- 64000
- Form
- Tower
- Topology
- Online Double-Conversion
Tripp Lite (Eaton) industrial-grade UPS — SmartOnline SU-series 5–20 kVA on 208/230 V, plus SmartOnline S3M three-phase 10–80 kVA. For SCADA, PLC, control rooms, and process-industry power.
Industrial UPS protects loads in environments where power events translate to lost production — SCADA control rooms, programmable logic controllers (PLCs), CNC and motion-control systems, process-industry sensors and actuators, water and wastewater plants, transportation control. Industrial UPS prioritises galvanic isolation, wide input voltage tolerance, hard-wired terminal connections, three-phase support, and chassis hardened for harsher ambient conditions.
Tripp Lite's industrial-grade catalog covers two tiers: single-phase SmartOnline SU-series 5–20 kVA on 208/230 V for control-room and skid-mounted equipment, and three-phase SmartOnline S3M 10–80 kVA for facility-scale deployments. UPSPLUSBATTERY.CA stocks the single-phase range and quotes the S3M three-phase line on request. For commercial server-room equivalents see Tripp Lite SmartOnline UPS. Full Tripp Lite catalog at Tripp Lite UPS.
| Family | Power range | Phase | Connection | Typical use |
|---|---|---|---|---|
| SmartOnline SU (5–10 kVA) | 5 / 6 / 8 / 10 kVA | Single-phase 208/230 V | L6-30P or hard-wired | Control panel, light industrial, edge SCADA |
| SmartOnline SU (10–20 kVA) | 10 / 16 / 20 kVA | Single-phase 208/230 V | Hard-wired | Mid-density industrial single-phase |
| SmartOnline S3M | 10 – 80 kVA | Three-phase 208 V | Hard-wired modular | Data-centre, large facility, hot-swap modules |
Industrial PLCs, motion drives, and instrumentation generally cannot tolerate the 2–4 ms transfer of line-interactive — even brief gaps cause control-loop interruptions. SmartOnline is double-conversion online: zero transfer time, full input isolation, fully regenerated sine wave at all times.
Most control-room equipment runs single-phase 208/230 V — SmartOnline SU 5–20 kVA covers this tier. Three-phase S3M 10–80 kVA when upstream is three-phase or load exceeds ~20 kVA single-phase.
Industrial loads often have inrush currents 6–10× nominal. Add nameplate watts × 1.25 buffer for steady-state, then verify the UPS's overload tolerance against expected inrush. Confirm specific inrush handling with our team. UPS sizing guide.
Most industrial deployments size battery runtime for graceful shutdown — typically 15–30 minutes. SmartOnline supports BP-series external battery packs for runtime extension; S3M uses external battery cabinets configured at install.
| Model | Power | Phase | Connection | Replacement battery |
|---|---|---|---|---|
| SU5000RT4U | 5000 VA / 4500 W | Single, 208 V | L6-30P | RBC96-2U or BP pack |
| SU6000RT4U | 6000 VA / 4200 W | Single, 208/230 V | L6-30P or hard-wired | RBC96-2U or BP pack |
| SU10KRT3UTAA | 10 kVA / 9 kW | Single, 208 V | Hard-wired | SUBM10KRM3U |
| SU20KRT3UTAA | 20 kVA / 18 kW | Single, 208 V | Hard-wired | External battery cabinet |
| S3M10K | 10 kVA / 9 kW | Three-phase 208 V | Hard-wired modular | S3M battery module |
SU 5–6 kVA: RBC96-2U or BP-series external pack. SU 10–20 kVA: SUBM10KRM3U module or external battery cabinet. S3M three-phase: dedicated battery cabinet with hot-swap modules. Aftermarket SLA replacements stocked for SU-series cells — 1-year UPSPLUSBATTERY warranty. Tripp Lite replacement batteries.
SU 5–6 kVA on L6-30P plug — dedicated 30 A 208/230 V circuit by licensed electrician per CSA. SU 10 kVA+ hard-wired only. S3M three-phase always requires commissioning by qualified Tripp Lite / Eaton-authorised technician. Warranty: typically 2–3 years on SmartOnline electronics. Coordinated through our Canadian team. Shipped from our Canadian warehouse. Replies within 1 business day.
SU 6K (4200 W) covers a typical control-panel + skid load. SU 10K (9 kW) covers larger industrial cabinets or denser PLC racks. 6K plug-in via L6-30P; 10K hard-wired only.
When upstream is three-phase 208 V, when load exceeds ~20 kVA single-phase, or when modular hot-swap power and battery is required. Always commissioned by qualified technician.
SmartOnline specifies peak overload current and duration. Size against worst-case transient. Replies within 1 business day.
SNMP card slot on SU-series accepts WEBCARDLX. SNMP, web, Modbus, integration with VMware, Hyper-V, Linux via PowerAlert.
BP-series external battery packs on SU 5–10 kVA. External battery cabinets on SU 20K and S3M. Sized to ride-through requirement at install.
Yes — Tripp Lite (Eaton) factory warranty covers Canada. Coordinated through our Canadian team.
Our Canadian team has specified APC, Eaton, Tripp Lite, Vertiv, Mitsubishi, Toshiba, CyberPower, XPC, and Delta UPS for healthcare, data centres, and government. Enquiries answered in business hours.