Xtreme Power P80g-3000 3000 VA / 2700 W Line-Interactive UPS
- Power
- 3000 VA / 2700 W
- Form
- Tower/Rack Convertible
- Outlets
- 1× IEC 60320 C19, 8× IEC 60320 C13
Xtreme Power Conversion 3–10 kVA UPS: P80g 3 / 5 kVA line-interactive, P91 5 / 6 / 10 kVA Unity PF online, TX91 3.8–10 kVA isolated online, M90C 5 / 8 / 10 kVA three-phase.
Not sure which one fits? Open the UPS Solutions Builder →
3 to 10kVA UPS systems: for full server racks, medical imaging, industrial process control, and edge data centers.
The 3 to 10kVA range supports a fully loaded 42U server rack, a medical imaging suite, an industrial process line, or a small edge data center. At these capacities, online double-conversion is the only sensible topology, and 208/230V input is standard for higher current efficiency. Optional isolation (TX91) and voltage regulation (TXVR) variants are available for noise-sensitive loads.
Xtreme Power's 3 to 10kVA range covers the P80g 5kVA bundles, the P91 5/6/10kVA series with KB and KTB bundles (including transformer/PDU options), the TX91 isolated online series, the TX91L long-runtime variants, and the TXVR voltage regulators.
3 to 10 kVA is the dense-rack and branch-data-centre tier: full racks of servers, blade chassis, GPU compute, edge data-centre cabinets, mid-size lab and industrial loads. At this level, 120 V becomes inefficient and the standard voltage is 208/230 V single-phase on NEMA L6-30P, or 208 V three-phase hard-wired. Battery strings are larger; runtime extension via external battery packs becomes routine; SNMP and remote management become mandatory.
XPC's 3 to 10 kVA range: P80g-3000 / 5000 line-interactive sinewave; P91 5K / 6K / 10K Unity PF online; TX91 3.8 / 5 / 6 / 10 kVA isolated online; M90C 5K / 8K / 10K three-phase modular online. UPSPLUSBATTERY.CA stocks the range with matching XPC battery packs for runtime extension. For under-3 kVA see XPC 1 to 3 kVA. For full XPC catalog see Xtreme Power Conversion.
| Series | Topology | VA / kW | Phase | Connection |
|---|---|---|---|---|
| P80g-3000 | Line-interactive sinewave | 3 kVA / 2.7 kW | Single 208/230 V | Hardwired or L6-20/30P bundle |
| P80g-5000 | Line-interactive sinewave | 5 kVA / 4.5 kW | Single 208/230 V | Hardwired or L6-30P bundle |
| P91-5K | Online, Unity PF | 5 kVA / 5 kW | Single 208 to 240 V | NEMA L6-30P, 6 ft |
| P91-6K | Online, Unity PF | 6 kVA / 6 kW | Single 208 to 240 V | NEMA L6-30P, 6 ft |
| P91-10K | Online, Unity PF | 10 kVA / 10 kW | Single 208 to 240 V | Terminal block (hard-wired) |
| TX91-3.8K | Online + Isolation | 3.8 kVA / 3.8 kW | Single 208 V | Terminal block or L6-30P bundle |
| TX91-5K / 6K / 10K | Online + Isolation | 5 / 6 / 10 kVA | Single 208 V | Terminal block or L6-30P bundle |
| M90C-2S5K | Modular Online three-phase | 5 kVA / 5 kW | Three-phase 120/208 V | Hardwired |
| M90C-2S8K | Modular Online three-phase | 8 kVA / 8 kW | Three-phase 120/208 V | Hardwired |
| M90C-6S5K / 8K / 10K | Modular Online three-phase | 5 / 8 / 10 kVA | Three-phase 120/208 V | Hardwired, 6-slot enclosure |
P91 5 to 10 kVA Unity PF, 5 kVA = 5 kW, 6 kVA = 6 kW, 10 kVA = 10 kW. TX91 also Unity PF with internal galvanic isolation. P80g 0.9 PF: P80g-5000 = 4500 W. M90C three-phase, 120/208 V in/out.
Up to 10 kVA single-phase 208/230 V is the rack-deployment default and feeds a metered/switched L6-30 rack PDU. Three-phase M90C is required when upstream service is three-phase and you want to balance load across phases. Below 10 kVA, single-phase P91 is usually simpler.
Both online double-conversion at this kVA range. P91 is standard online: IT rack and edge compute. TX91 adds internal galvanic isolation transformer: for medical, lab, or any site requiring isolated power. TX91 also supports up to 8-hour battery runtime via external packs. XPC isolated UPS.
P91 5 / 6 / 10 kVA ship in P91-5KB, P91-6KB, P91-10KB rack/tower bundles (4U / 5U). P91-5KTB / 6KTB / 10KTB transformer-bundle versions add 208/120 V step-down for sites that need 120 V output from 208 V upstream. TX91 bundles (TX91-3.8KB1, TX91-5KB1, etc.) include L6-30P 6-foot input cord and pre-configured output panels.
Add nameplate watts of all loads, multiply by 1.25 buffer. P91-6K (6 kW) covers a typical 30-server 1U rack drawing ~150 W per server (4500 W) with headroom. Don't oversize: data-centre UPS efficiency drops below 30 % load. Sizing guide.
P91 5 / 6 / 10 kVA: BPXR2U240A (2U) or BPXR3U240A (3U) extended battery packs, 20× 12 V batteries, hot-swappable. TX91: TX91-BP960-1 / 2 / 3 packs, up to 3 packs per UPS, up to 8-hour runtime. P80g-5000: P80-BP72X. M90C: matching battery cabinets with M90 modules. SLA cartridges stocked as compatible aftermarket, 1-year UPSPLUSBATTERY warranty. Browse XPC battery packs and XPC UPS replacement batteries.
P91-5K and P91-6K on L6-30P plug, dedicated 30 A 208/230 V circuit by licensed electrician per CSA. P91-10K and M90C three-phase hard-wired only. TX91 plug-in bundles on L6-30P; terminal-block versions hard-wired. M90C commissioning by qualified XPC-authorized technician. Optional XBDM-P91 maintenance bypass distribution module for service without dropping load. Warranty (USA and Canada): P80g, P91 5 to 10 kVA, TX91 standard 3-year electronics + 3-year battery, optional 5-year extended (P95P610, T9SP610). M90C 2-year standard, with on-site startup options. Coordinated through our Canadian team. Shipped from Canada: see shipping policy for rates and timing.
6K (6 kW) covers a typical mid-density 1U rack of 25 to 30 servers. 10K (10 kW) covers a denser rack with blades, GPU, or storage arrays. 6K plug-in via L6-30P; 10K hard-wired only. Spec on actual measured rack draw, not nameplate-future-load.
Same online double-conversion topology. P91 is standard online for IT. TX91 adds internal galvanic isolation transformer for medical, lab, and any site requiring isolated power. TX91 also supports up to 8-hour battery runtime. XPC isolated UPS.
When upstream distribution is three-phase 208 V (typical at 8 kVA+ in branch data centres). M90C is modular: 2-slot or 6-slot enclosure, 5 / 8 kW power modules. Hot-swappable for live capacity expansion or N+1 redundancy.
P91-5K and 6K ship with NEMA L6-30P plug, dedicated 30 A 208/230 V circuit. P91-10K, M90C, P80g-5000 hardwired versions hard-wired only. TX91 ships in both bundle types.
For sites with generator: 5 to 10 minutes to genset stabilization. For sites without: 15 to 30 minutes for graceful shutdown and replication failover. TX91 supports up to 8-hour ride-through via TX91-BP960 packs for sites without generator. XPC battery packs.
SNMP-2PV3 internal card on P91, TX91, M90C. SNMP v1/v2c/v3, web management, integration with VMware, Hyper-V, Nutanix, Windows, Linux shutdown agents. MODBUS-IN card optional for industrial / BMS. SNMP-EMPV2 environmental sensor.
Yes: XPC 3 to 10 kVA series factory warranty terms explicitly cover USA and Canada. Ships from Canada.