1 |
Do you deliver to every part of Québec? |
Yes. UPSPlusBattery ships anywhere in Canada. Please provide the exact drop-off address and any access notes. |
2 |
Can you supply new batteries, a display panel, and a cooling fan for an emergency-lighting inverter? |
Yes. Let us know the brand, full model number, and total battery count so we can build a kit quote. |
3 |
Do you troubleshoot an APC Back-UPS 1500 (BN1500M2-CA) out of warranty that flashes F02/F02 errors? |
Yes. Share the unit’s serial number and latest alarm history so we can price repair vs. replacement. |
4 |
Could you suggest backup-power packages for a compact server closet? |
Yes. Tell us the total load in kW and the runtime you’d like in minutes; we’ll send options. |
5 |
Do you offer emergency call-out and preventative maintenance for our UPS gear? |
Yes. Please specify the manufacturer, kVA rating, and the date of the last service visit. |
6 |
Can you provide forty APC UPS units in different sizes for laboratory instruments? |
Yes. List each instrument’s watt draw, desired autonomy, and required delivery schedule. |
7 |
Can you exchange forty batteries in a Powerware 9390 inside a federal site in Ottawa? |
Yes. Confirm the exact battery spec and any site-security procedures we must follow. |
8 |
Can you fit customer-supplied batteries into a Tripp Lite SU30K3/3? |
Yes. Let us know the number of blocks and your preferred service date. |
9 |
Do you sell a swap-out battery cartridge and take back the spent block? |
Yes. Provide the OEM part code of the old module and your shipping details. |
10 |
Is 24 / 7 emergency support available for critical UPS outages? |
Yes. Send your contract ID (or note “new customer”) along with an on-site contact. |
11 |
Do you perform yearly PM on 20 kVA three-phase UPS systems? |
Yes. Tell us brand, model, and original commissioning date so we can reserve parts. |
12 |
Can you run a capacity test on a 12 V / 100 Ah VRLA string? |
Yes. State the block count and advise whether full shutdown is permissible for testing. |
13 |
Do you install external maintenance bypass panels to keep loads live while the UPS is serviced? |
Yes. Email us your one-line drawing and wall-mount clearances. |
14 |
Can you bundle multi-site service coverage across Canada? |
Yes. Provide site list and UPS / battery inventory for a consolidated proposal. |
15 |
Is it possible to retrofit lithium-ion packs into a modular UPS? |
Yes. Share the UPS part number and desired Li-ion reference so we can check compatibility. |
16 |
Can you carry out an infrared scan of our main switchboard and UPS? |
Yes. We’ll schedule during peak load for best thermal data. |
17 |
Do you handle certified recycling of spent lead-acid batteries? |
Yes. Estimate weight or block quantity so we can arrange collection. |
18 |
Can you complete an energy audit to extend UPS runtime? |
Yes. Share load logs and battery age; we’ll return an optimisation report. |
19 |
Can you convert a single-phase UPS to a three-phase platform? |
Yes. We’ll need load distribution and an acceptable downtime window. |
20 |
Do you stock OEM logic boards or cooling fans for APC Smart-UPS? |
Yes. Quote the part or serial number so we can verify inventory. |
21 |
Can you program APC SNMP network cards for remote monitoring? |
Yes. Provide target IP, VLAN, and security (SSH/SNMPv3) requirements. |
22 |
Do you recalibrate temperature and humidity probes in a data suite? |
Yes. Let us know probe count and manufacturer for calibration gear. |
23 |
Can you source 10-year high-temp AGM batteries? |
Yes. Share ambient temperature range and runtime target. |
24 |
Do you install slim 19″ rack-mount micro-UPS units for lab benches? |
Yes. Specify load (watts) and available rack depth. |
25 |
Could you engineer an N+1 UPS design for a Tier III data centre? |
Yes. Provide critical load and space allocation. |
26 |
Do you train on-site teams in UPS emergency procedures? |
Yes. Indicate headcount and technical depth required. |
27 |
Can you recommend portable UPS packs for mobile lab trolleys? |
Yes. Tell us payload wattage and desired backup time. |
28 |
Do you manage firmware upgrades on Eaton 93PM units? |
Yes. Confirm current revision and whether a service bypass is in place. |
29 |
Can you hot-swap power modules in a Delta modular UPS? |
Yes. Advise module quantity and your maintenance window. |
30 |
Do you provide five-year, all-inclusive maintenance plans? |
Yes. Send the equipment list and SLA target (4-hour, NBD, etc.). |
31 |
Can you add extra battery cabinets to hit four-hour autonomy? |
Yes. We need total load and floor space for additional racks. |
32 |
Will you guarantee CSA / UL compliance on a new industrial UPS install? |
Yes. Please share electrical drawings for pre-approval. |
33 |
Do you rent temporary UPS systems for events? |
Yes. State duration, power level, and venue. |
34 |
Can you retrofit arc-flash detection into existing PDUs? |
Yes. Provide PDU make and desired comms protocol. |
35 |
Can you supply LiFePO4 battery sets for my current UPS? |
Yes. Give UPS model and present capacity so we can adjust the BMS. |
36 |
Do you carry compact, high-frequency double-conversion UPS for sensitive instruments? |
Yes. Tell us kVA rating and THD tolerance. |
37 |
Can you integrate leak-detection sensors in a battery room? |
Yes. Provide room dimensions and preferred protocol. |
38 |
Will you replace an IGBT module in a 60 kVA UPS? |
Yes. Send the module code and UPS model for lead-time confirmation. |
39 |
Do you schedule proactive fan swaps every five years? |
Yes. Share fan count and operating hours. |
40 |
Can you slide a 2U UPS into an already full rack? |
Yes. Confirm available U-space and rear-access clearance. |
41 |
Do you integrate CAN-bus smart-battery tech? |
Yes. Provide battery brand and target UPS firmware version. |
42 |
Can you coordinate a remote UPS reboot after maintenance? |
Yes. Let us know if your own staff will supervise or if we need to send a tech. |
43 |
Do you support marine-grade UPS maintenance contracts? |
Yes. Specify vessel type, port of call, and service intervals. |
44 |
Can you supply 400 Hz converters for aerospace rigs? |
Yes. State kVA and backup duration needed. |
45 |
Will you certify UPS commissioning for high-security banking sites? |
Yes. Send access-control rules and go-live date. |
46 |
Can you swap an older UPS for a current Energy-Star unit? |
Yes. Provide load readings so we can model ROI. |
47 |
Do you offer monthly visual and IR battery inspections? |
Yes. Indicate string count and facility location. |
48 |
Can you supply ultra-fast aR fuses for DC battery banks? |
Yes. Confirm current rating, DC voltage, and physical size. |
49 |
Is real-time SMS / email alerting available for UPS alarms? |
Yes. Tell us which monitoring stack (Nagios, PRTG, etc.) you use. |
50 |
Do you perform on-site desulfation of sealed lead batteries? |
Yes. Share block count and approximate age. |
51 |
Can you carry out an overnight battery swap with zero downtime? |
Yes. Confirm the after-hours window and onsite safety policies. |
52 |
Do you measure battery impedance to gauge State-of-Health? |
Yes. Provide string size and terminal-access details. |
53 |
Can you supply IP55 outdoor UPS cabinets with heaters? |
Yes. Share min/max ambient temps and load. |
54 |
Can you convert a 208 V UPS system to 400 / 230 V? |
Yes. Send single-line and three-phase load data. |
55 |
Do you provide interior cleaning and torque-check services? |
Yes. Tell us UPS size and last service date. |
56 |
Can you supply a rental generator while we replace a UPS? |
Yes. State kW demand and fuel logistics. |
57 |
Do you carry out CSA C282 compliance checks for hospitals? |
Yes. Note the province and facility class. |
58 |
Will you fill and commission Ni-Cd batteries on site? |
Yes. Provide cell count and electrolyte handling requirements. |
59 |
Can you parallel two 80 kVA UPS units for redundancy? |
Yes. Share electrical drawings and spare conduit runs. |
60 |
Do you supply UN3480-compliant Li-ion packs for avionics? |
Yes. Provide capacity and quantity for DG paperwork. |
61 |
Can you extend OEM warranties by enrolling in a certified service plan? |
Yes. Provide make, model, and warranty expiry. |
62 |
Will you replace an upstream isolation transformer? |
Yes. Give voltage and kVA so we can size a replacement. |
63 |
Do you log transients and harmonics on the UPS input? |
Yes. Specify measurement duration and MSB access. |
64 |
Can you oversee a full “rip-and-replace” UPS upgrade? |
Yes. Send existing inventory and timeline. |
65 |
Do you have compact r-Rack UPS kits for mobile workstations? |
Yes. Provide required power and enclosure size. |
66 |
Will you verify UPS efficiency at 25 %, 50 %, and 100 % load? |
Yes. Share load profiles and measurement availability. |
67 |
Can you disconnect and reconnect a UPS during a data-room move? |
Yes. Provide move date and relocation distance. |
68 |
Do you install Bluetooth-enabled battery monitoring? |
Yes. Tell us battery make and block count. |
69 |
Can you supply hospital-grade double-conversion UPS for MRI systems? |
Yes. Provide voltage tolerance and load details. |
70 |
Can you enable cellular remote diagnostics for a distant site? |
Yes. Confirm LTE/5G coverage and UPS model. |
71 |
Do you stock genuine APC RBC cartridges? |
Yes. Quote the RBC number (e.g., RBC7, RBC55) and quantities. |
72 |
Can you swap an RBC7 in a Smart-UPS 2200? |
Yes. Reserve a time slot and confirm rack accessibility. |
73 |
Will you flash the latest firmware on APC SmartConnect models? |
Yes. Provide current version and service window. |
74 |
Do you offer five-year parts-and-labour plans for Eaton 9PX units? |
Yes. Share kVA size and unit count. |
75 |
Can you change the fans inside an Eaton 93E 40 kVA? |
Yes. Provide serial number and preferred outage period. |
76 |
Can you extend an SMX1500RM2U runtime to four hours? |
Yes. State actual load and rack space for extra packs. |
77 |
Do you fit rail-mount kits for Tripp Lite rack UPS units? |
Yes. Specify rack depth and UPS model. |
78 |
Can you replace the inverter module in an Eaton 93PM 150 kVA? |
Yes. Provide module ID and firmware level. |
79 |
Will you configure APC NMC2 / NMC3 cards? |
Yes. Supply target IP and VLAN. |
80 |
Do you source certified Li-ion packs for Smart-UPS models? |
Yes. Provide UPS model and runtime goal. |
81 |
Can you run a runtime calibration on a Smart-UPS? |
Yes. Schedule a low-load window if needed. |
82 |
Do you recycle spent APC batteries at no cost? |
Yes. Provide weight or block count. |
83 |
Can you add a five-year extended warranty to Tripp Lite gear? |
Yes. Provide model and purchase date. |
84 |
Do you install maintenance bypasses for Eaton 9E series? |
Yes. Share one-line drawing and wall space. |
85 |
Can you upgrade from Symmetra LX to Symmetra PX? |
Yes. List critical load and deadline. |
86 |
Will you replace DC fuses in an Eaton 9395? |
Yes. State fuse spec and part code. |
87 |
Can you activate Eaton HotSync for N+1 redundancy? |
Yes. Give unit count and total kVA. |
88 |
Do you supply external battery modules for Tripp Lite SU2200RTXLCD2U? |
Yes. Note module quantity and rack space. |
89 |
Do you stock L6-30P output cords for Smart-UPS 5000? |
Yes. Provide length and cert preference. |
90 |
Can you run a live runtime test on an Eaton 93PS? |
Yes. Needs an operational static bypass. |
91 |
Can you add a gigabit card to an APC Galaxy VS? |
Yes. Provide card SKU and firmware. |
92 |
Do you change seven-year capacitors in an Eaton 9355? |
Yes. State install date and run hours. |
93 |
Will you link Smart-UPS units to EcoStruxure cloud? |
Yes. Provide unit count and SLA needs. |
94 |
Can you replace the internal battery in a Tripp Lite OmniSmart 1500? |
Yes. Supply serial number and date. |
95 |
Do you perform energy audits on thirty Eaton 5P units? |
Yes. Share average load and savings goal. |
96 |
Can you ship an AP9631 network card for an APC SRT3000XLA? |
Yes. Give shipping info and setup prefs. |
97 |
Do you install Li-ion battery cabinets on an Eaton 93PM G2? |
Yes. Specify runtime requirement and desired energy density. |
98 |
Can you carry out an annual IR thermography on an APC Galaxy 5000? |
Yes. We’ll arrange during high-load operation. |
99 |
Do you change dust filters on Tripp Lite SU10KRT units? |
Yes. Provide filter count and interval. |
100 |
Can you parallel two Eaton 9SX units? |
Yes. Supply firmware level and kit type. |
101 |
Do you stock high-temperature cells for Smart-UPS SUA? |
Yes. Provide ambient heat and current Ah. |
102 |
Can you fit leak-detection cabling on Eaton battery racks? |
Yes. Give room size and comms protocol. |
103 |
Do you carry BP48V60RT4U extension cables for Tripp Lite packs? |
Yes. Confirm length and rack spare. |
104 |
Can you convert a 1000 VA tower Smart-UPS into a rack unit? |
Yes. Requires rail kit and bezel. |
105 |
Do you deliver Eaton Foreseer / PXG Gateway training? |
Yes. Provide attendee count and objectives. |
106 |
Can you trend impedance on Symmetra PX battery frames? |
Yes. List module count and access rules. |
107 |
Do you supply Tripp Lite UPS approved to CSA C22.2 No 107.3? |
Yes. Specify kVA and runtime. |
108 |
Can you install the Energy Saver feature on an Eaton 93E? |
Yes. Provide current firmware. |
109 |
Will you integrate Smart-UPS with VMware vCenter via PowerChute? |
Yes. Specify ESXi version and license. |
110 |
Do you perform sag-ride-through tests on medical-grade UPS? |
Yes. Provide load profile and acceptance limits. |
111 |
Do you stock IEC C19-C20 16 A cords for Smart-UPS? |
Yes. State length and colour. |
112 |
Can you plug in Eaton PXGX network cards? |
Yes. Give card code and firmware. |
113 |
Do you support mass USB firmware upgrades on Smart-UPS units? |
Yes. Provide device count and host OS. |
114 |
Can you supply Nickel-Zinc battery packs for small UPS units? |
Yes. Provide model and required backup time. |
115 |
Will you configure Eaton Intelligent Power Manager under Hyper-V? |
Yes. Provide IPM and Hyper-V versions. |
116 |
Do you run DC insulation resistance testing on VRLA banks? |
Yes. Provide block count and nominal voltage. |
117 |
Can you change the touch-screen on an APC Galaxy VM? |
Yes. Provide site and maintenance slot. |
118 |
Do you carry paralleling harnesses for Tripp Lite UPS? |
Yes. List models and cable length. |
119 |
Can you map an Eaton UPS to a Modbus-TCP BMS? |
Yes. Provide IP and register list. |
120 |
Do you carry out IEEE-519 harmonic surveys at industrial sites? |
Yes. Indicate measurement points and load level. |